Skipped task
If the task could not be run at the pre-defined time, you can specify when it will be performed:
•At the next scheduled time—The task will be executed at the specified time (for example, after 24 hours).
•As soon as possible—The task will run as soon as possible when the actions that prevent the task from executing are no longer valid.
•Immediately, if the time since the last run exceeds a specified value—Time since the last run (hours). After you select this option, your task will always be repeated after the specified amount of time (in hours).